Закрыть

CV send

Full name
Vacancy
Attach your CV
Закрыть

319 mln. rubles were transferred for the development of the port infrastructure of JSC “Sea Port of Saint-Petersburg”

8 of February 2012

In 2011 JSC “Sea Port of Saint-Petersburg” transferred 319 mln. rubles for the implementation of port infrastructure development programme.

Main part of the funds was transferred for the renovation of the fleet of  handling equipment. In particular 9 lift-trucks “Kalmar” with the lifting capacity from 10 up to 33 tons for handling of general cargoes, terminal tractor for the transportation of cargoes on roll-trailers with the weight up  to 32 tons and 40’ roll-trailer with the lifting capacity of 70 tons were delivered last year.

2 mobile rubber-tyred Liebherr cranes LHM 600, suitable for handling of  cargoes with the weight up to 140 tons were also delivered to the berths of the company.

New equipment will allow to increase the intensity of handling of cargoes and to decrease the expenses for maintenance and renovation of handling equipment.

Besides, starting from the beginning of 2011 works on reconstruction of  railway tracks and facilities for smooth running of trains have been carried at  the first and second cargo areas of the port. It is planned that  all  these measures will allow to increase the throughput capacity of the terminals for handling of metals up to 500 thousand tons per month.

To other news